During the Molum Project A Dart & Co where contracted to install a new bund wall for the recommissioning of Tank 105. The tank was decommissioned during the Refinery shut down in 2015 and recently been refurbished as a diesel storage tank. The Earthern Bund wall was installed to a height of 2.8m and over 8m wide at the base and over 70m long, using site won material.
Project Value $150,000