Construction of a new multi-purpose hall which comprised of large staged area, full sized sports court and kitchen servery area.
The Building was constructed on piers on a sloped site and featured extensive structural steelwork and metal wall cladding.
Working on a sloped site and limited vehicle access, the obstacles presented by the site location were challenging. These were largely surmounted through regular and cooperative consultation between the school and construction staff to ensure both parties could continue to operate fluently.